Cp 0,528 achieved
Having done numerous different settings on the fairly old 55 kW turbine and manual settings on pitch angle of the ...
Read More
Read More

Serviced rotor re-installed
Within the first month of test on the 55kW turbine, it was apparent that both the turbine and the rotor ...
Read More
Read More

Test start on 55 kW turbine
The Joint Blade Rotor have been mounted on a 55kW Vestas turbine. The turbine have been in use for some ...
Read More
Read More

Cooperation with Nordic Folkecenter
Joint Blade Rotor and Nordic Folkecenter signs an agreement for joint testing. The Joint Blade Rotor blades are to be ...
Read More
Read More

Third test results
The DEIF measurements have been updated with more data and collected into the final report for the V27 test period ...
Read More
Read More

Second test results
The second measurement campaign data is presented by DEIF in an updated report. The results are promising but unclear at ...
Read More
Read More

First test results
First report containing initial test data results are presented by DEIF. Joint Blade Rotor is on the right track, but ...
Read More
Read More

Test on Vestas V27
The first test has commenced on a Vestas V27 widmill. As the Joint Blade Rotor blades are not designed for ...
Read More
Read More

First rotor set manufactured
The first set of Joint Blade Rotors have been manufactured and are now undergoing performance and durability tests ...
Read More
Read More

Test wing specification
First design is planned to be implemented on a 60kW turbine. Based on a turbine like that, the performance specifications look ...
Read More
Read More

Company formation
Joint Blade Rotor A/S is formed by a joint agreement between the founders: Aalborg University Borean Innovation A/S Den Midtjyske ...
Read More
Read More